EDI Module Replacement for a 60 T/H Demineralized Water System at Datang Changchun Power Plant

Project overview: the customer operated two 60 T/H EDI systems, one of which could no longer meet production requirements. Clayson EDI modules were selected as replacements; final product water reached 17.8 MΩ·cm and the system passed acceptance.

▦ Case Studies / Project Record ◷ Published 2026-11-16 15:20:00 ◉ Views 3 Back to Case Studies →
Project DetailsPROJECT DETAILS

EDI module replacement at Datang Changchun Power Plant 60 T/H demineralized water system

Project overview: the customer operated two 60 T/H EDI systems, one of which could no longer meet production requirements. The owner finally chose Clayson EDI modules as replacements. Quanzhou Clayson Automation Technology Co., Ltd. carried out on-site installation and commissioning; final product water reached 17.8 MΩ·cm and the system passed acceptance.

GET A SOLUTION

Off-spec EDI product water and frequent alarms?

Stack repair, replacement and system optimisation, with a 1-to-1 proposal for your conditions.

Call Now +86 400-862-1862
Online Support
Contact

Hotline

+86 18017752343

Business Hours

Monday - Friday

Office

+86 400-862-1862

QR Code
WeChat QR Code
CHAT