


In November 2023 Quanzhou Clayson Automation Technology Co., Ltd. won the contract to repair 20 Suez 5T EDI modules for Everbright Biomass Thermal Power (Lu'an) Co., Ltd. Factory inspection found that excess residual chlorine had oxidised the resin and membranes, reducing module flux. Clayson optimised the complete ultrapure water system, repaired the EDI modules, and its engineers reinstalled and commissioned them, bringing the EDI project into smooth operation.


Support 1